How much do solar panels cost in Bexleyheath in 2026?
25 August 2026 · 6 min read
Real prices for a typical Bexleyheath roof, what you actually save each year, and why payback now lands closer to five years than ten.
What a system costs today
For most homes around Bexleyheath, Welling and Blackfen a sensible starting point is 10-12 × 480W panels with a hybrid inverter, which we install from £5,000. That covers a rear extension or outhouse roof where scaffolding needs are minimal.
Larger detached homes in Lamorbey or Old Bexley usually take 14-16 panels, which pushes the price up but improves the pence-per-kilowatt-hour you end up paying for your own power.
- 10-12 panels, no battery: from £5,000
- 14-16 panels with hybrid inverter: typically £6,500-£8,500
- Adding 5kWh+ battery storage: from around £3,000 on top
What you save each year
An average 3-bed home in the DA postcodes spends roughly £1,450 a year on electricity. A well-sited 5kW array typically cuts that to around £435 once daytime use is shifted into generation hours, with export payments on the surplus.
Add a battery and you keep about 85% of what you generate on site rather than exporting it cheaply, which is where the shortest paybacks come from.
Payback, honestly
We model with your real half-hourly consumption rather than optimistic averages. On a simple, low-scaffold roof with good orientation, payback from five years is realistic. On a shaded north-facing roof it is not, and we will tell you that at survey rather than sell you a system that does not stack up.
Spreading the cost
Because the savings begin immediately, many customers use 0% APR finance over 12 months so the monthly repayment is partly offset by the bill reduction. Longer terms at 10.9% APR are also available, subject to status.
Common questions
Do I need planning permission for solar in Bexley?
For the vast majority of pitched roofs it is permitted development. Listed buildings and conservation areas need checking first, which we do as part of the survey.
How long does installation take?
One to two days on site for a typical domestic array, including the electrical connection and commissioning.